C-33 Painting & Decorating Quiz

Welcome to your free C-33 Painting & Decorating Quiz

1. 
How should you dispose of hazardous materials?

2. 
What do you do with the remains after you have washed latex paint brushes with water?

3. 
If you are bidding on a job that is similar to a job you completed six months ago, and you are planning to use the same materials, what should you bid for the materials?

4. 
How should you load a 10' ladder into a truck bed?

5. 
If an employee earns $20.00 per hour plus $1.50 per hour for vacation, and you pay $2.00 per hour in tax and $9.00 for every $100.00 in payroll for workers comp, what is the total hourly wage for the employee?

6. 
How many linear yards of 52-inch wallpaper would you need to cover a wall that is 100 ft long and 9 9ft high?

7. 
What is most important when choosing what type of brush to use?

8. 
Which of the following is required for hazardous materials dealers?

9. 
What is the maximum amount of asbestos that may be removed before DOSH must be notified?

10. 
Which of the following should you do with used rags?

11. 
What sort of PPE (personal protective equipment) is recommended when using cleaning solvent?

12. 
What should be done with lifelines, safety harnesses, and shock-absorbing lanyards that have been subjected to impact loading?

13. 
What is the longest standard length of a scaffold plank?

14. 
Except for __________ all 120-volt, single phase, 15-and 20-ampere branch circuits supplying outlets installed in dwelling units shall be protected by a listed arc-fault circuit interrupter, combination type installed to provide protection of the branch circuit.

15. 
Where a cable or raceway type wiring method is installed through bored holes in joist, rafters, or wood members, in both concealed and exposed locations, holes must be bored so that the edge of the hole is __________ in. or more from the nearest edge of the wood member. Where the distance is not possible, the cable or raceway must be protected from penetration by nails or screws by use of a steel bushing or plate, __________ in thick or more, and of the correct length and width installed to cover the area where the wiring is located.

16. 
A device intended for the protection of personnel that functions to de-energize a circuit or portion thereof within an established period of time when a ground-fault current exceeds the values established for a Class A device.

17. 
All switches and circuit breakers used as switches shall be located so the operating handle, when in its highest position, is not more than __________ above the floor or working platform.

18. 
For conductors on a branch circuit that supplies luminaires in a residence, what is the maximum allowable voltage between conductors on a branch circuit supplying luminaires in a residence?

19. 
All conductors of the same circuit and, where used, the grounded conductor and all equipment grounding conductors and bonding conductors shall be contained within the same ___________.

20. 
An organization, office, or individual responsible for enforcing the requirements of a code or standard, or for approving equipment, materials, an installation, or a procedure.